The lines priced apart: the unit, the post, the labor, and the removal lines, each inside its own frame, never summed.

Orange County, CA · Updated 2026 · Costs shown as ranges — your quote will vary by installer and scope

Reading this guide: every figure below is a range compiled from published 2026 pricing data — not a quote. Two published frames are named apart and never blended: Frame A (the Angi frame) counts a new brick mailbox band, with existing-brick repair named apart as a repair line; Frame B (the HomeGuide frame) counts a standard installation band with unit, post, and labor lines priced apart. Always get 3 written quotes.

The lines, priced apart by frame

Cost lineFrame A readingFrame B reading
Unit lineno unit-alone line printed; the unit counts inside the $600-$1,500 new brick bandunit alone at $20-$500+
Post lineno post line printed in Frame Aposts at $25-$250
Labor lineno labor-alone line printed in Frame Ainstallation labor alone at $100-$400; masonry-structure labor at $500-$1,200
Removal lineno removal line printed in Frame Acharged separately, no separate figure printed

In Frame A the lines print only inside the one new brick mailbox band; in Frame B the unit, post, and labor lines print apart, and the removal line stands as a separate charge with no figure printed. No Frame B line is summed into a Frame A total. The mailbox installation job whole prices on the mailbox installation hub, and the repair line named apart in Frame A stands at $150-$400.

The unit and post sublines

Subline, as publishedFrame2026 band
Unit aloneFrame B$20-$500+
PostsFrame B$25-$250
Unit-alone lineFrame Ano unit-alone line printed
Post lineFrame Ano post line printed
Standard installation, the band behind the sublinesFrame B$150-$350
Premium mailbox with decorative postFrame B$400-$600

The unit line and the post line stand apart in Frame B, each printed as its own line and neither folded into the other: Frame A carries the unit only inside its new brick band at $600-$1,500.

The labor and removal sublines

Subline, as publishedFrame2026 band
Installation labor aloneFrame B$100-$400
Masonry-structure labor, brick/column formFrame B$500-$1,200
Removal lineFrame Bcharged separately, no separate figure printed
Labor-alone lineFrame Ano labor-alone line printed
Existing-brick repair line, named apart, never a removal lineFrame A$150-$400

The labor and removal lines here are cost lines of a new mailbox installation in the post-mount, wall-mount, and brick/column forms, priced apart from repair of an existing masonry mailbox structure, which sits in its own lane. Named apart, never a line here: mail slots, and cluster box units.

The totals behind the lines, by frame

Total, as publishedFrame2026 band
New brick mailboxFrame A$600-$1,500
Standard installation, averageFrame B$150-$350
Premium mailbox with decorative postFrame B$400-$600
Existing-brick repair line, named apartFrame A$150-$400

The total readings are separate countings of one mailbox installation job, printed apart, each on its own frame: a masonry repair total is a different job and prints in its own lane.

Reading a breakdown quote

Cost guide, not advice: the ranges below are compiled from published 2026 pricing data. Your price will vary with mailbox form, unit, and post as quoted. This guide does not endorse, rate, or recommend any firm or contractor. Figures are informational ranges only, not quotes.

Frequently asked questions

What is the unit line in a mailbox installation breakdown, as reported?

Frame B prints the unit alone at $20 to $500+. Frame A prints no unit-alone line; the unit counts inside its new brick mailbox band at $600 to $1,500, beside standard installation in Frame B at $150 to $350.

What does the post line print at, as reported?

Frame B prints posts at $25 to $250 as their own line, and a premium mailbox with decorative post at $400 to $600 including materials and labor. Frame A prints no post line.

What does the labor line print at, as reported?

Frame B prints installation labor alone at $100 to $400, and masonry-structure labor on the brick/column form at $500 to $1,200. Frame A prints no labor-alone line; its new brick band stands at $600 to $1,500 whole.

What does the removal line print at, as reported?

Neither frame prints a removal figure: Frame B reports old mailbox removal as charged separately with no separate figure printed, and Frame A prints no removal line. Frame A's $150 to $400 figure is an existing-brick repair line, named apart, never a removal line.

Can the breakdown lines be added into one total?

No. The line readings sit inside their own frames, the standard and new brick totals stand as printed in each frame, and no combined total prints here. Repair of an existing masonry mailbox structure, mail slots, and cluster box units are separate jobs, named apart.