Deck Lighting Cost Breakdown Guide

The lines priced apart: fixture, transformer, cable run, labor, and controls lines each stand in their own frame, and no line is summed into another.

Orange County, CA · Updated 2026 · Costs shown as ranges — your quote will vary by installer and scope

Reading this guide: every figure below is a range compiled from published 2026 pricing data for Orange County — not a quote. Two published frames, Frame A (the HomeYou per-light frame) and Frame B (the Angi landscape-lighting frame), are named apart and never blended: Frame A counts the single deck light installed and Frame B counts a per-fixture average inside a whole-property project. Always get 3 written quotes.

The lines, priced apart by frame

Cost lineFrame A, per-light readingFrame B, per-fixture reading
Fixture line$7-$13 per lightcounted inside the $125-$300 band
Transformer linecounted inside the per-light totalcounted inside the project bands
Cable run linecounted inside the per-light totalcounted inside the per-fixture band
Labor line$119-$123 per lightcounted inside the per-fixture band
Controls lineno separate line carriedno separate line carried

Every figure here is a published reading, printed apart: Frame A prints two priced lines of its own, the fixture and the labor, and counts the transformer and cable run lines inside its per-light total; Frame B counts every line inside its per-fixture band. The job whole prices on the deck lighting hub; the forms on the by-fixture guide.

The fixture and labor lines, as reported

Cost line, as publishedFrame2026 reading
Fixture, Manhattan BeachFrame A$7-$12 per light
Fixture, MalibuFrame A$7-$13 per light
Labor, Manhattan BeachFrame A$119 per light
Labor, MalibuFrame A$123 per light
Total to install, Manhattan BeachFrame A$176-$220 per light
Total to install, MalibuFrame A$182-$228 per light

Frame A counts the fixture and labor lines on their own rows, city by city, inside its per-light totals. Frame B counts both inside its deck and patio band and prints no fixture-only or labor-only figure.

The transformer and cable run lines, as reported

Cost line, as publishedFrame2026 reading
TransformerFrame Ainside the per-light total band
TransformerFrame Binside the whole-property project bands
Cable runFrame Ainside the per-light total band
Cable runFrame Binside the $125-$300 per-fixture band
Job materials and suppliesFrame A$1-$25 per light
Equipment allowanceFrame A$49-$67 per light

The transformer and cable run lines carry no separate published figure in either frame: both are counted inside the printed bands. Frame A's nearest printed lines are job materials and supplies at $1 to $25 and an equipment allowance at $49 to $67 -- neither is read as a transformer or cable run price.

The controls line, as reported

Controls line, as publishedFrame2026 reading
ControlsFrame Ano separate line carried
ControlsFrame Bno separate line carried
Per-fixture band beside the controls lineFrame B$125-$300 per fixture

The controls line carries no priced figure in either frame, and it stands on its own row for that reason: a breakdown printing only priced lines would hide a line quotes name apart. The neighbours stay apart here too -- the landscape guide prices a yard design system, the floodlight cluster prices house fixtures, and the deck cost hub prices the structure.

Reading a breakdown quote, by frame

Cost guide, not advice: the ranges below are compiled from published 2026 pricing data and industry sources. Your price will vary with fixture form, fixture count, and cable run. This guide does not endorse, rate, or recommend any firm or contractor. Figures are informational ranges only, not quotes.

Frequently asked questions

What is the fixture line in a deck lighting breakdown, as reported?

Frame A prints the fixture line at $7 to $12 per light in Manhattan Beach and $7 to $13 in Malibu, on its own row. Frame B counts the fixture inside its deck and patio band at $125 to $300 per fixture and prints no fixture-only figure.

What does the labor line print at, as reported?

Frame A prints the labor line at $119 per light in Manhattan Beach and $123 per light in Malibu. Frame B counts labor inside its per-fixture band and prints no standalone deck labor figure.

What does the transformer line print at, as reported?

Neither frame prints a separate transformer figure in this cluster. The transformer line is counted inside the per-light total in Frame A and inside the whole-property project bands in Frame B, and no figure is read into it.

What do the cable run and controls lines print at, as reported?

The cable run line is counted inside the published bands in both frames with no standalone figure. The controls line carries no priced figure in either frame. Both stand on their own rows as named cost lines.

Can the breakdown lines be added into one total?

No. The priced lines sit inside separate bands inside separate frames, and the transformer, cable run, and controls lines carry no separate priced figure at all. No combined total is printed in this cluster.